Electric prime mover pulling a hydrogen-extended road train across the Australian outback at blue hour

Proven concept · Real world demonstration

Non-Stop Road Train.Real Advantage.

Patented hydrogen extended range bolts on behind any electric truck — it never touches the vehicle. No cutting, no rewiring, no driveline changes. Your factory warranty stays exactly where it is, while your range, uptime and payload economics change completely.

Real-time range counter
1,800km non-stop
Factory: 500 kmKinetic enhanced
Vehicle integrity: 100%Factory warranty: activeZero charging stops · Zero rest stop downtime · Maximum productivity
01Our hydrogen electric advantage

The Future of Freight Is Here

Tesla prime mover + patented hydrogen technology + road train. No waiting. No rest stop downtime. Drive day and night, swap drivers, keep moving — 24 hours a day, 7 days a week.

Non-Stop Driving

Hydrogen extended range keeps the wheels turning.

01

24/7 Operation

Trucks run day and night — 365 days a year, not parked at a charger.

02

Swap Drivers

Two drivers means 14+ hours saved per 24 hours. The truck never rests.

03

Safe & Reliable

Patented technology, real-world demonstrated on Australian road trains.

04

Lower Costs

Less infrastructure dependency. Higher payload, higher profits.

05

Proven Concept

A working vehicle — not a slide deck. Real concept. Real results.

06
02Plug & play anatomy

Range Added. Truck Untouched.

The key factor: the range increase happens entirely outside the vehicle. Nothing is modified, so nothing is voided.

Proving the concept — non-stop around Australia demonstration graphic with hydrogen tank system safely housed under the trailer
Unit AEI-H2 / Trailer Integrated
Hitch couplingTrailer deck tanksNo vehicle port required
Zero Intervention · Warranty Intact
01

Zero-Void Warranty Guarantee

The unit couples to the trailer, not the truck. No driveline, battery pack, software or high-voltage system is opened, spliced or reflashed — so there is nothing for a manufacturer to void.

02

Universal Fitment

Works behind any electric prime mover — Tesla Semi, Ford F-150 Lightning fleets, Rivian, Volvo FH Electric, Fuso eCanter. If it tows, it takes range.

03

Hydrogen Tanks, Safely Hidden

Tanks are integrated under the trailer deck. Maximum payload retained, maximum safety, no interference with loading or dock height.

04

Thermal Management

Independent closed-loop cooling on the range unit itself. It carries its own thermal load instead of pushing heat into the vehicle's systems.

05

No Tools Installation

Hitch, couple, confirm. A quick-start sequence any driver completes in minutes at the yard — no workshop, no technician, no downtime.

03The range configurator

How Much Further?

Select a vehicle and a trip distance. See the charging stops disappear and the hours come back.

Vehicle
Trip distance1,200 km
200 km4,400 km
Factory range

800 km

Hydrogen enhanced range

2,720 km

Charging stops — battery only

1

Charging stops — our setup

0

Estimated hours saved

9h

Vehicle modification required

None

Indicative figures for comparison purposes. Real-world results vary with load, terrain and climate.

04Australian road train network

Non-Stop Routes, Coast To Coast

Capital cities and rural towns, run without a charging stop. Average saving of 7h 30m – 10h 00m per trip on rural runs, and up to 49 hours on transcontinental freight.

Non-stop road train routes to rural towns

Battery electric times include charging stops

RouteDistance (km)Our hydrogen non-stopBattery electric (with charging)Time saving
Brisbane → Roma → Charleville1,28019h 30m – 21h 00m27h 00m – 30h 00mUp to 7h 30m
Brisbane → Toowoomba → Goondiwindi → Moree1,05016h 00m – 18h 00m24h 00m – 26h 00mUp to 8h 00m
Sydney → Dubbo → Bourke → Broken Hill1,33014h 00m – 22h 00m28h 00m – 31h 00mUp to 8h 00m
Melbourne → Mildura → Renmark → Adelaide1,05016h 30m – 18h 00m24h 00m – 26h 00mUp to 7h 30m
Adelaide → Port Augusta → Coober Pedy85013h 00m – 14h 30m20h 00m – 22h 00mUp to 7h 30m
Perth → Kalgoorlie → Norseman → Esperance1,60024h 00m – 26h 00m33h 00m – 36h 00mUp to 10h 00m
Darwin → Katherine → Tennant Creek → Alice Springs1,48022h 00m – 24h 00m31h 00m – 33h 00mUp to 9h 00m
Cairns → Townsville → Mount Isa1,42021h 00m – 23h 00m30h 00m – 32h 00mUp to 9h 00m
Townsville → Rockhampton → Emerald1,10017h 00m – 18h 30m25h 00m – 27h 00mUp to 8h 00m
Melbourne → Wagga Wagga → Griffith9509h 30m – 14h 30m16h 30m – 18h 00mUp to 6h 00m

Capital city to capital city — non-stop comparison

Times include rest stop downtime for battery electric

RouteDistance (km)Our hydrogen setupBattery + rest stopsTotal time saved
Sydney → Melbourne8788h 30m17h 30m9h 00m
Melbourne → Brisbane1,74017h 00m35h 00m18h 00m
Sydney → Brisbane1,70017h 00m35h 00m18h 00m
Brisbane → Perth4,36043h 00m88h 00m45h 00m
Perth → Adelaide2,70027h 00m52h 00m25h 00m
Adelaide → Sydney1,37019h 00m38h 00m19h 00m
Darwin → Brisbane4,30045h 00m94h 00m49h 00m
Long-exposure night shot of an electric truck moving along a desert highway
05Eliminate rest stop downtime

The Real Time Savings Advantage

Australian log book rules: a solo driver can work up to 12 hours in a 24-hour period and must take at least 7 continuous hours of stationary rest. Two drivers and no charging stops means the truck simply keeps moving.

vs Charging Stops Only

7h 30m – 10h 00m

saved per trip

vs Charging Stops + Rest Stops

17h 00m – 25h 00m

saved per trip

vs Legal Rest Stops Only

7h 00m+

saved per trip

Per driver, per 24 hours

7+ hours

No required 7-hour rest stop for the truck. Swap drivers, keep the truck moving — 24/7 operation, 7 days a week.

Two drivers

14+ hours

Saved per 24 hours. Run 24/7, 365 days a year. More time on the road. More deliveries. More profit.

06Business benefits for trucking companies

Win More Contracts. Deliver Faster. Earn More.

Deliver faster and you win more work. Outperform the competition and you own the future of freight.

  • Instant asset write-off for eligible clean energy assets
  • No charging infrastructure dependency
  • No legal rest stop downtime — swap drivers
  • Run 24/7, 365 days a year
  • Lower $/km — higher payload
  • Happier customers — reliable on-time delivery
  • Maximum asset utilisation — highest ROI

More deliveries.

More revenue.

More growth.

More profit.

Maximum asset utilisation, maximum payload, zero charging infrastructure spend — the highest ROI path to zero-emission freight, without touching the truck you already own.

07Australia is investing in the renewable future

$76+ Billion Committed. And Growing.

Australia is in the middle of the largest renewable energy investment and procurement wave ever. Stronger incentives. More projects. More demand. More growth. Source: Australia Tender Alerts (May 2024).

$22.7B

Capacity Investment Scheme (CIS)

Underwrites renewable energy projects.

$2B+

Hydrogen Headstart Program

Supporting renewable hydrogen production.

$1.3B

Hydrogen Commercialisation Pathways

Grants for large-scale hydrogen projects.

$1B

Future Made in Australia Innovation Fund

Backing clean energy manufacturing.

Tax incentives & support

  • R&D Tax Incentive for innovation and development
  • Clean Energy Finance Corporation (CEFC) funding
  • Stamp duty concessions (state-based)
  • Accelerated depreciation for eligible assets
  • State & territory zero-emission truck initiatives
Aerial view of Australian renewable energy infrastructure at dawn

Invest in the future. Invest in performance. Invest in profit.

08Investor opportunity · early-stage equity

Get In Before The IPO.

Angel investors welcome. Alternative Energy International is opening a limited early-stage equity raise — before government grants and project financing accelerate the share price.

Ground-floor entry

Early startup-stage equity — secure your position before the share price appreciates on the back of grant funding and commercial traction.

Government-backed tailwinds

$76B+ in Australian clean-energy programs — CIS, Hydrogen Headstart, Future Made in Australia — underwriting demand and de-risking growth.

Pre-IPO positioning

Get in before IPO. As grants and project financing land, early holders ride the valuation step-up — not the public market.

Proven concept, not a slide deck

A demonstrated real-world vehicle — de-risked versus pure R&D plays, with a clear path to revenue from fleet deployments.

Why now

Early allocation is limited.

Grants and government co-funding are landing now. Early equity is priced for the stage before that leverage compounds. Express interest to receive the investor deck and early-stage terms.

  • Angel investors welcome
  • Flexible ticket sizes
  • Pre-IPO entry
  • Government grant leverage
See the proven MG4 concept →
Indicative investment
Investor status

Expressions of interest only — not an offer to issue or sell securities. Any offer will be made under an appropriate disclosure document or exemption in accordance with applicable Australian law.

09Licensing

Licensing Enquiries

AEI grows by licensing the build of AEI systems. Tell us who you are, your territory and your intended application — all licenses are vetted by the central AEI licensing group.